Glencore office

We would like to note a convenient organization of communication with PRIDEX team at the construction object. So, outside the building site the operational staff was located, in which the technical personnel of the contractor was placed. Because of that the release of executive documentation and holding important meetings directly on an object was possible.

Letter's scan Project's page
logo

Vip-office for JSC Freight One

As the result of cooperation JSC Freight One recommends PRIDEX as the skilled and reliable partner, that has all necessary competences for implementation projects of any complexity.

Letter's scan Project's page
logo

World Class Taganskaya fitness club

 

Construction of the bathing complex including premises of hammam and a sauna and also the salt room became features of the project of new fitness club World class. The project was realized according to the original design including installation of a number of custom-made products.

 

Letter's scan Project's page
logo

Office of Orange Business Services in Otradnoye

Division of the new office into two functional zones became feature of the project: open space was separated from control center with rooms for managers. 
We would like to note unusual dusting of a ceiling by acoustic structures and a large number of elements of branding in finishing of office rooms which were constructed according to the corporate standards of the company.

Letter's scan Project's page
logo

Office for Hewlett Packard Enterprise

In 2017 separation of business divisions of ES (DXC.technology brand) and SW (Micro Focus brand) from HPE was announced. In this regard there was a need for organization of separate office spaces for new legal entities.
New office spaces were implemented according to the corporate requirements and the developed design project and were equipped with new office furniture, all the necessary engineering and office equipment – it was a result of deep synergy with Architects and Engineers of the Project.

Letter's scan Project's page
logo

Office of Shire company

During development of the project of interior representatives of PRIDEX proposed a number of solutions which were original and at the same time conforming to corporate standards of our company. 
From the realized ideas we especially distinguish: finishing of a zone of reception by MDF panels and a 3D-wavy tile, extensive use of photo wallpaper for branding of rooms and also use of felt wallpaper and marker paint in finishing of meeting rooms.

Letter's scan
logo

Office of Danaher Corporation

General contractor got the task to rebuild the premise which was initially designed under production needs so that the new office met all modern requirements to commercial premises of A class. During implementation of this project PRIDEX employees proposed a number of innovative construction and engineering solutions.

Letter's scan Project's page
logo

Offices for PSA Banque and PSA Group

Thanks to efforts of the general contractor, in the one office space located on the 7th floor of business center were created two comfortable offices, one of which was occupied by PSA Banque, and another one was developed for PSA Group company.
Installation of emitters of the system of sound masking Quiet Technology, which is providing protection of acoustic data through the high level of noise reduction in the office of CEO of PSA Group company became the feature of the project.

Letter's scan Project's page
logo

Office of Maxxium

According to the design project, a PRIDEX team organized a bar area in the office, where a bar counter made of the glued girder was set up. The bar area can be united with two meeting rooms, equipped with the transformed partitions, forming a big space for holding events.

The design of meeting rooms in our office was chosen according to the stylistics of the brands of our alcoholic products.
Letter's scan Project's page
logo

Office of Relx Group

Acting as the general designer and general contractor, PRIDEX produced architectural and engineering design as well as carried out a complex of construction and engineering works.
Location of the office on the 3rd floor of the operating business center became the feature of the project, and because of general contractor had to carry out noisy works at nighttime and in the weekends.
We would like to note customer-oriented approach of PRIDEX team which was quickly reacting to the remarks and adjustments arising during the process of construction.

Letter's scan Project's page
logo

Don Sport fitness club

Acting as the general designer and general contractor, PRIDEX produced architectural and engineering design, as well as carried out a complex of construction and engineering works and measured acoustic influence of work of gym.
In addition, purchase of construction and finishing materials, furniture and the equipment was also produced by the general contractor.

Letter's scan Project's page
logo

Office of Unilever

Works on renovation were conducted in the operating business center, in the premises next to the functioning part of our office. However, thanks to the measures for sound insulation taken by the general contractor's representatives, producing construction works didn’t interfere with work of our employees in the office. During construction PRIDEX employees paid attention to cleanliness on the building site, and safety measures.

Letter's scan
logo

World Class Metropolis fitness club

World Class fitness club in multifunctional center Metropolis-II became the landmark project constructed according to the new design concept. The design project of new fitness club assumed realization of a number of innovative solutions: in particular, in fitness club there were installed the partitions bent in two planes, which were not touching ceiling. In addition, during implementation of the project PRIDEX team used for finishing translucent concrete and produced  installation of products made from an artificial stone and also made finishing of walls with imitation of concrete with traces from a timbering and outflow of concrete on seams.

Letter's scan Project's page
logo

Office of Heineken

Employees of PRIDEX have done a great job on selection and order of furniture and elements of a decor as long as the project assumed installation of a large number of the products executed by the individual order; in particular, the custom-made curvilinear parquet board Bolefloor was used in finishing of the floor. Design project of our new office also included arrangement of a bar zone in the office.

Letter's scan Project's page
logo

Office of Mattel

Use of expensive materials, such as natural interline interval, tile, a floor covering with effect of concrete became feature of the project of new office. 

A big amount of expensive materials, such as natural veneer, tiles with effect of a brick wall, glazed porcelain stoneware and floor covering with effect of concrete became feature of new office. In addition, PRIDEX group did a great job on selection and order of furniture and elements of a décor, because the project assumed installation of a large number of the products executed by the individual order.

Letter's scan Project's page
logo

Office of Man

We would like to note thorough elaboration of utilities in the project of our new office made by general contractor. Despite the small height of ceilings, PRIDEX team managed to place a significant amount of utilities not only in rooms with a hinged ceiling, but also in office zones with initially designed open ceilings.

Letter's scan Project's page
logo

Office of Segezha Group company

Fulfilling the role of general contractor, PRIDEX performed a complex of general construction works and MEP systems works as well as engineering design.
A big amount of expensive materials, such as veneer panels, lamellas, fabrics and wooden panels, that were used in finishing walls became feature of new office. Design of the office included a number of original decisions, such as built-in niches with upholstered furniture and separate glass partitions.

Letter's scan Project's page
logo

Office of Orange Business Services

Acting as the general designer and general contractor, PRIDEX produced architectural and engineering design, and design of inner monolithic staircase, as well as carried out a complex of construction and engineering works General contractor also coordinated works with developers of special technical requirements of the building.

Letter's scan Project's page
logo

Headquarters of Adidas

We note the customer-oriented approach and high level of professionalism of PRIDEX company’s stuff, who have demonstrated high quality of the produced construction works. On behalf of Adidas company we recommend PRIDEX company as an experienced and reliable partner, who has all the necessary competencies to carry out projects of any complexity in time.

Letter's scan Project's page
logo

Audi showroom

Specifics of the project assumed implementation of numerous high-technology multimedia decisions therefore the functionality of PRIDEX team included coordination of more than 15 contractors. We also would like to mention the work with suppliers of construction materials which was carried out by PRIDEX and directed to a budget optimization with preserving the highest quality of the decisions used within the project.

Letter's scan Project's page
logo

Office of Criteo company

This project was implemented in two turns. Initially PRIDEX company was involved as general contractor in construction of the premises of our first office with the area of 500 sq. m. 

We were pleased with results of cooperation with this company and when we needed to expand the area of our office by accession of additional rooms, we proposed PRIDEX to become general contractor on construction of the second object.

Letter's scan Project's page
logo

Office of Smith & Nephew company

Acting as the general designer and general contractor, PRIDEX produced architectural and engineering design as well as carried out a complex of construction and engineering works.
Because of location of the office in operating business center general contractor had to carry out noisy works at night and in weekends.
We would like to note customer-oriented approach of PRIDEX team and high level of professionalism of the team which has allowed the contractor to finish all works in the terms established by the contract.

Letter's scan
logo

St. Nickolas apartments

As the result of cooperation within the project of finishing of premium class apartment complex St. Nickolas we would like to note high professionalism and a customer-oriented position of PRIDEX and we recommend this company as the reliable and responsible partner capable to realize the project of any complexity in time at permanently high quality of performed works.

Letter's scan Project's page
logo

Office of VTB

Short deadlines of realization of works and the fixed cost of the contract became features of the project. We would like to note that PRIDEX company has implemented the project in the operating business center, where the general contractor had to carry out big amount of works at night and also had to perform of a number of actions for protection of already existing finishing of lift halls and corridors.

Letter's scan
logo

Office of Booking.com

During implementation of this project PRIDEX produced re-planning, finishing and engineering works, equipping the office with engineering equipment and built-in furniture. An important detail of the project was the embodiment of an idea of designers in strict accordance with existing rules of maintenance of premises.

Letter's scan Project's page
logo

Office of Praxair company

Short deadlines of carrying out works and preservation of a considerable part of the existing materials and the engineering equipment became a feature of the project. This approach allowed to optimize the budget of the project.

We would like to note that during the realization of the project PRIDEX team showed customer-oriented approach and ability to solve problems fast, and these factors made our cooperation comfortable for us.

Letter's scan
logo

Office of AstraZeneca company

During implementation of this project general contractor had to produce the most part of works at night in order not to disturb our employees. 

Letter's scan Project's page
logo

Office of HP company

Works were carried out on 9, 10 and 11 floors in the conditions of the operating office, and the general contractor had to produce noisy works only at night and in the weekends. 

Because of planned separation of the company there was an urgent need in the organization of separate client zone including new reception, complex of meeting rooms, showroom and also group of bathrooms and coffee point.
Letter's scan Project's page
logo

Showroom of Sovremennik residential apartments

Vesper company thanks PRIDEX for effective implementation of finishing works and installation equipment of the sales office and the showroom of a premium class object Sovremennik.

Thanks to professionalism of PRIDEX team all the planned works were performed in time, and it allowed to provide the start of functioning of sales office of Vesper company on schedule.
Letter's scan Project's page
logo

Construction of offices and lobby in BC Wall Street

In the tender process for the choice of general contractor we estimated experience, existence of resources, necessary for implementation of the project, and reputation of applicants. As the result of the tender PRIDEX company made the most competitive offer.

The project has been divided into several parts, differing in specifics: the lobby of business center Wall Street, lift halls and office rooms intended for renting.
Letter's scan Project's page
logo

Office premises in BC White Gardens

A lot of experience in implementation of projects, own material and technical resources, highly skilled personnel and also accurately organized work of department of supply and logistics allows PRIDEX company to produce works under the contract in time, with appropriate quality and within the budget of construction.

Finishing works were performed in the conditions of the strict restrictions connected with impossibility of production of noisy and dirty works in the daytime. However, it didn’t affected neither quality of the executed finishing, nor a date of completion of works.
Letter's scan Project's page
logo

Offices of Panasonic company

The main requirements to the general contractor were: successful experience of implementation of similar projects, existence of considerable own professional and production resources, readiness to realize the project in the conditions of short deadlines.

During the realization of this project general contractor had to perform considerable amount of additional works. Nevertheless, the team managed to finish works in time.
Letter's scan Project's page
logo

Office of ThyssenKrupp AG company

ThyssenKrupp of AG thanks PRIDEX for high-quality implementation of office premises in BC Delta Plaza. The solution of trace of utilities proposed and realized by this company allowed to sustain equal height of ceilings in all office premises and became the certificate of high level professionalism of PRIDEX team. 

Letter's scan
logo

Office premises in BC Lotte

LLC MARSA thanks PRIDEX company for implementation of the project of office premises intended for renting in BC Lotte. Creation of an effective flexible interior with a possibility of fast and most inexpensive re-planning under needs of tenants was one of the main tasks realized by PRIDEX within this project. 

Letter's scan Project's page
logo

Office of American Chamber of Commerce

The need of producing works in operating BC became a distinctive feature of this project; because of the location of the object general contractor could produce noisy types of works only in daytime. Nevertheless, this fact didn’t affect the completion date of the project. 

The design project of new office provided installation of different architectural elements: use of a considerable amount of an artificial stone in a reception zone, installation of glass partitions with communication panels, installation of a metal ceiling and stemalit walls panels.
Letter's scan Project's page
logo

Office premises of BC Skylight

In a year of active cooperation PRIDEX have realized more than 14 000 sq. m of qualitative office interiors for the leading Russian and foreign companies among which there is CJSC Stroytransgaz, INLINE Techologies, Karos, Metso Minerals, Arsenal, Stryker, Messe Frankfurt, VIPS Design office.

Letter's scan Project's page
logo

Refurbishment and finishing works in the Central Childrens Shop

We note high managerial qualities of a project team of PRIDEX which provided an operational start of producing works of a significant amount of workers, and fixed effective channels of delivering of finishing materials, despite of the project arrangement in a historical part in the center of Moscow. During the implementation of the project representatives of the contractor exercised operational management of considerable amount of works at the same time on several sites, located on 2 underground and 7 elevated floors. At the moments of peak loadings on the building site about 300 workers of PRIDEX were involved in the realization of the project.

Letter's scan
logo

Office of Merck company

Acting as general designer and general contractor, PRIDEX produced architectural and engineering design as well as carried out a complex of construction and engineering works. This approach allowed the general contractor to come to the building site before final signification of the design project that as a result allowed PRIDEX to produce all works in time established by the contract.

On behalf of the management of MERCK company, I recommend PRIDEX company as responsible general contractor with all necessary professional and production resources and experience for implementation of projects of finishing of high quality offices in the conditions of short deadlines.
Letter's scan
logo

Office premises of BC Four Winds

Especially we want to note the approach of the management of the company aimed at the result, which allowed us to finish design and construction of the object ahead of schedule with appropriate quality, despite the changes made by the customer, within the agreed budget of the project.

Letter's scan Project's page
logo

MONTIS' friends bar&kitchen restaurant

During implementation of this project PRIDEX has realized a number of interesting constructive decisions, among which there were: mezzanine floor with a guest zone, additional bathrooms and the managing director's office; zone for a karaoke equipped with a sound-proof transforming partition; the decorative fireplace collected according to sketches of the architect and decorated by a brick made in 18th century. 

Letter's scan Project's page
logo

Lobby of Savelovsky City multifunctional center

Distinctive feature of the project of lobby of Savelovsky City multifunctional center was the original design providing use of non-standard finishing materials and also installation of an architectural group. The general contractor has started implementation of the project even before completion of installation of a facade under actually street conditions. However, it didn’t affect terms and quality of the performed finishing works.

Letter's scan Project's page
logo

Family thematic park Masterslavl

PRIDEX company implemented access to the building site at the stage when the multifunctional center Evoliutsyia wasn't put into operation yet. In this regard at the first stages the general contractor had to perform works under harsh conditions, connected with continuous  power supply outages and heating deficiency. 

Within the project a great job on selection of beautiful, durable and safe materials has been done. For example, facades of pavilions "Museum", "Theatre", "Management of Russian Railways" were made of natural plaster and concrete, for construction of floors in the public places and facades of rooms the decorative concrete imitating stone blocks or a brick tile was used. This use of materials allowed to achieve considerable economy of the budget.

Letter's scan Project's page
logo

Office of Armstrong company

 

The concept of new office provided a combination of usual functions of a similar interior with a showroom  for production of Armstrong company. In this regard designers of PRIDEX have proposed the solution allowing to involve in project 15 various collections of ceiling systems and 7 collections of floor coverings produced by Armstrong. 

Works were conducted in the operating multipurpose center, half of which was occupied by residential apartments, and this fact has significantly limited time of producing noisy works.

 

Letter's scan Project's page
logo

Office of Kerry company

Working in the conditions of the operating BC, PRIDEX has provided works at night, and it has allowed to exclude hindrances in work of the neighbouring offices of other tenants. 

At the office there has been provided a technical zone, where various engineering equipment is used. During implementation of the project, a significant amount of the issues connected with a general architecture, laying of utilities and installation of terminals has been solved.

Letter's scan Project's page
logo

Office of T-service Logistiks company

Zone of responsibility of PRIDEX included re-planning of office interior according to our requirements, adaptation of engineering systems to new planning solutions and also development of relevant working documentation. We emphasize that the general contractor has completely fulfilled all obligations enshrined in the contract.

Letter's scan Project's page
logo

Office of Standard & Poor's company

 

During implementation of this project the company acted as the professional of high level: quickly reacted to remarks and the customer's wishes, helping to make technically correct decisions and observing the difficult design concept.
We would like to note that the essential restrictions connected with conducting construction in the operating business center located at the territory of the Central Administrative District and need to delivery of materials and the equipment and also performance of noisy works only in night time didn’t affect observance of terms of implementation of the project.

 

Letter's scan Project's page
logo

Office for FNK group of companies

 

Representatives of PRIDEX have developed new project which provided all nuances. In particular, for ensuring the set height of a ceiling some sites of the existing engineering systems were remade.

We note that all works were performed in the operating high-rise building in full accordance with regulations of multipurpose center Capital city, which allows performing noisy works only for three hours a day.

We would also like to note strengths of PRIDEX: system approach to control of terms of the performed works and a customer-oriented position of staff of the company.

 

Letter's scan Project's page
logo

Visa center in St. Petersburg

 

Producing works on short notice was a basic condition of implementation of the project for LLC TLSKONTAKT: general contractor had to finish the project in 6 weeks, and part of this period fell on holidays. The concept of the project provided realization of visa center in turn-key format and included stages of architectural and design engineering, producing general construction and engineering works.

During the implementation PRIDEX team has shown high level professionalism and flexible, customer-oriented approach.

 

Letter's scan
logo

Miele showroom

The zone of responsibility of the general contractor included adaptation of the German design project taking into account the Russian requirements, and also producing a full complex of engineering and construction works. The specifics of the architectural project provided a number of difficult technical solutions which have been successfully realized by the design PRIDEX team.

As the result of cooperation Miele company is completely satisfied with high quality of the performed works which have been completed ahead of schedule and, also pays attention to observance of safety measures, maintenance of cleanliness and order on the building site by staff of the general contractor.
Letter's scan Project's page
logo

Office of Arsenal company

 

Representatives of PRIDEX acted as professionals with considerable experience of construction of similar objects that in particular has allowed to provide in advance the order of materials which delivery occupies considerable terms.

We would like to note customer-oriented approach of the general contractor, who was ready to react quickly to the corrections arising on our part during the implementation of the project. We note that mainly because of  such position an object was handed over in time specified in the contract.

 

Letter's scan Project's page
logo

Office of Stryker company

We note a customer-oriented position of PRIDEX company, which management have created the comfortable atmosphere for collaboration over the project. Modern office interior which is completely conforming to specifics of our business and all requirements imposed to offices of A class became a result of collaboration.

Letter's scan
logo

Office of the INLINE Technologies company

The scale of the project, which occupied five floors in BC Skylight, didn’t influenced observance of terms of implementation of the project. 

A number of the interesting decisions of the organization of space, which involved the main reception, the block of meeting rooms, a big conference room with the transformed partitions, was realized at the new office of INLINE Technologies.

We note a principled position of PRIDEX team in questions of quality control of the performed works, safety and labor protection, and also high corporate culture of the general contractor.

Letter's scan Project's page
logo

Canteen for RT

TV-Novosti expresses gratitude to PRIDEX  for organization of works and the constructive resolving issues arising during the process of implementation of the project of the canteen for Russia Today TV channel.

Letter's scan
logo

Office of GEA company

 

In the process of preparation of the project of engineering systems designers of PRIDEX suggested  to reorganize the existing shafts and engineering struts of the building. This decision allowed to increase the useful area of the office.

Thanks to excellent knowledge of features of the building, the project team has produced the most effective trace of engineering systems that has allowed to sustain ceiling height, and it has positively affected the level of comfort of an interior.

 

Letter's scan
logo

Skybar

Besides arrangement of restaurant, bar and a conference zones on the area of 1200 sq. m, the project included a complex of complicated construction and engineering works including the replacement of a panoramic glazing with a total area more than 800 sq. m at the height of 65 m, executed in 30 days under bad weather conditions, and installation of a new roof on the area of 1200 sq. m. At the same time works on creation of autonomous engineering systems were carried out, in particular, installation of the modern ventilation plant and arrangement of a refrigeration unit with a power of 1,5 MWt.

Letter's scan Project's page
logo

Office of Royal Canin company

Tender for the choice of the general contractor has defined the most competitive offer made by PRIDEX company. The essential successful experience of implementation of difficult projects in the design&build format was also a reason to choose this organization as a general contractor for our project.

We would like to note professional approach of PRIDEX company which has allowed to realize the project qualitatively even in the conditions of the short notice.
Letter's scan Project's page
logo

Office premises in BC PREO 8

 

PRIDEX has given effective support to sales of vacant area of BC, providing expeditious preparation of space-planning decisions for potential clients and also performing functions of the general designer and general contractor during realization of the projects of office interiors for tenants of BC PREO 8.

For 2,5 years of effective cooperation about 30000 sq. m of office interiors for Morton Group, BDO Consulting, Oranta, Draeger, Teleperformance, MAN, Open Group, GEA and also network of Smart food restaurants were implemented.

 

Letter's scan Project's page
logo

Fitness club World Class Sevastopolsky

We would like to note that, despite difficulties of implementation of this project, specialists of PRIDEX company dealt with objectives perfectly, and it allowed to implement the project in the planned time.

Letter's scan Project's page
logo

Office of Karos company

 

During implementation of the project of office interior representatives of the general contractor showed high level of professionalism.

We note a customer-oriented position of management of PRIDEX which was quickly reacting to the adjustments of the project, and it allowed to finish works in initially approved terms.

 

Letter's scan Project's page
logo

Office of international Euroasian Economic Commission

 

LLC City-Developer expresses the gratitude to PRIDEX for conscientious and high-quality implementation of the project of the office for international organization Euroasian Economic Commission in BC Vivaldi Plaza.

During implementation of this project the company acted professionally; the staff of the company reacted to remarks and the customer's wishes quickly.

 

Letter's scan Project's page
logo

Office of Ricoh company

During implementation of the project PRIDEX team showed high level of professionalism and interest in the result and also openness, flexibility and speed. Representatives of PRIDEX reported on a regular basis about each stage of the performed works, and this fact allowed to control the project’s implementation in the conditions of extremely short deadlines.

Letter's scan Project's page
logo

Smart food restaurant

 

During implementation of this project PRIDEX team acted professionally, resolved the issues arising quickly and effectively and related to objectives responsibly.

Such approach allowed the general contractor to finish the project in terms indicated in the contract, and with high quality. Especially we note professionalism of engineering department of PRIDEX which has designed and implemented the project of systems of air and cold supply, that effectively divided room for visitors and technological zone for cooking.

 

Letter's scan Project's page
logo

Office of Russian Fitness Group

 

Representatives of PRIDEX managed to develop and realize the concept of office in LOFT style with the most modern engineering systems. As a result the office turned out beautiful, convenient and functional.

Despite all difficulties which arose during producing reconstruction work the project was implemented qualitatively and in time.

 

Letter's scan Project's page
logo

Office of the Metso Minerals company

We would like to note professional and customer-oriented approach of the management of the company. During construction process special attention was paid to control of quality of the performed works, to observance of standards of safety and also to maintenance of discipline and an order on the building site.

Letter's scan Project's page
logo

Refurbishment of Azimut hotel

Competent approach of management of PRIDEX has allowed to adhere to the initial schedule of works strictly. Considering the beginning of a high season, observance of terms of implementation of the project by the general contractor hasn't broken the vital business processes of hotel.

Letter's scan
logo

Office of ORANTA company

During implementation of the project the general contractor showed responsible approach to the organization of the processes on the building site that has allowed to carry out acceptance of works successfully a week earlier the planned terms.

The design team carried out a big work on selection of finishing materials that has led to essential optimization of expenses of this part of the budget of the project with preservation of qualitative and visual characteristics of an interior at the high level.
Letter's scan Project's page
logo

Office of R-Style company

The main criteria of the choice of PRIDEX as the contractor became wide and successful experience of realization of similar objects, including projects located in historical buildings, compliance of the company to our requirements to suppliers and contractors and also the positive recommendations from clients. An additional argument in favor of this general contractor was the knowledge of design team of engineering systems of BC Trekhgornaya manufakture.

Letter's scan
logo

Office of Man company

 

Cooperation with general contractor during the implementation of this project provided the fixed cost of works and very short deadlines of realization, that demanded from the general contractor coordination of processes and excellent knowledge of the market, considering that the project included the installation of glass partitions and custom-made wooden doors.
We note the consecutive customer-oriented position of PRIDEX team concerning in particular matters of rapid response to the changes made from our party which in a short time and without additional coordination were referred in works, and it has positively affected the terms of producing works.

 

Letter's scan
logo

Office of Messe Frankfurt company

During the implementation of the project many times we noted customer-oriented approach of heads and experts of PRIDEX which allowed to resolve issues quickly, without additional bureaucratic procedures. We would also like to note that the general contractor provided comfortable interaction with the owner of BC Skylight and the operating organization.

Letter's scan Project's page
logo

Office of Teleperformance company

 

Short deadlines of construction were a basic condition of the contract with Teleperfomance: the general contractor had to finish the project in two months of rent vacation, and a part of this period was the New Year's holidays.

During the construction the design team and the management of PRIDEX showed flexible customer-oriented approach, therefore all the questions arising during the implementation of the project were resolved promptly.

 

Letter's scan Project's page
logo

Office of INNOVA company

 

Tender for the choice of general the contractor took place on the New Year's eve and the term of implementation of the project was limited up to two months by the rent vacation. Thanks to readiness of representatives of PRIDEX to undertake obligations for observance of terms and to provide implementation of all design decisions, we choose this general contractor.

The essential wear of the central engineering systems of the building demanding technical audit and modernization for providing comfortable working conditions of our employees became a specifics of this project.

 

Letter's scan Project's page
logo

Office of Ernst & Young company

Thanks to the organization of works in several changes and also producing works at night, PRIDEX company managed to carry out all complex of objectives at the high professional level, despite the short deadlines provided by the contract and the fact that all works were carried out in the operating building of Aurora Business Park complex.

Letter's scan
logo

Reconstruction of BC Domino

 

At a design stage representatives of PRIDEX offered a number of the rational decisions directed to increase of useful area of an object and improvement of its technical and economic indicators without changing the original architectural concept.

Thanks to presence of considerable production resources in PRIDEX company, at the separate moments on the building site there were concentrated about 300 workers, and it allowed to maintain the dynamic rates of implementation of the project and do not change the schedule of works. 

Short deadlines of the project also assumed performance of a considerable complex of construction and engineering works at night.

 

Letter's scan Project's page
logo

Corporate apartments of Calzedonia company

 

Implementation of the project of apartments was carried out in the operating tower, and producing works was only allowed on weekdays from 10 AM till 7 PM. The general contractor had to consider specific service conditions of the use of elevators in the high-rise building that obliged to pay special attention to logistics of construction materials and the engineering equipment.

We recommend PRIDEX company as the qualified contractor that is able to realize the difficult and large-scale project using the foreign project documentation.

 

Letter's scan Project's page
logo

Office of WORTMANN company

The project of the office was completed in 1,5 months. The area of the object was 1200 sq. m.

PRIDEX team started  to produce construction works before signing of the contract and before getting  of an advance payment. At all stages of the project the general contractor carried out works 24 hours a day. 

Construction of the office took place in the operating BC, and because of this the general contractor had to carry out noisy works only in the limited time, and also had to pay special attention to observance of an order and cleanliness on the construction site and during the delivery of construction materials.

Letter's scan Project's page
logo

Office of BDO company

 

The construction took place in the operating BC, and this fact had significant effect on the schedule of work. Besides, works took place in conditions of the high-rise building that obliged design team to pay special attention to safety and logistics of materials and to take into account the regulated access to the elevators. All these factors were considered in the planned schedule and didn’t affect the terms of producing works.

PRIDEX has proved that the company is a professional general contractor which is able to perform a complex of works on realization of commercial interiors quickly and qualitatively.

 

Letter's scan
logo

Office of KR Properties company

We especially note customer-oriented approach of PRIDEX, thanks to which mobilization of design team and the beginning of active works before signing of the contract became possible. Works at the object were produced 24 hours a day, including weekends. It has allowed the general contractor to provide moving of the KR Properties company in completed office in extremely short time – in 2,5 months.

Letter's scan Project's page
logo

Office for Align Technology company

We would like to note high professional qualities and motivation of the team. The constructive approach of PRIDEX team to the realization of specific details of the project has allowed to transfer all the ideas of the architectural project into the real interior.
On our part we want to note the work of engineering  department of PRIDEX which has realized the difficult project that included specific decisions for the gym, sauna and recreation area with a fireplace.

Letter's scan Project's page
logo

World Class Capital City fitness club

We are looking forward to the further cooperation with PRIDEX for construction of other objects for our company and we can recommend PRIDEX company as a reliable partner in the field of realization of construction projects.

Letter's scan Project's page
logo

Office of Morton company

 

The area of new office was about 10300 sq. m, and it was important for successful implementation of so large project that the general contractor had considerable financial and professional resources.

Departments of PRIDEX have quickly started construction process quickly and started works before signing of the contract and transferring advance payment. This approach has allowed to observe the terms of implementation of the project.

 

Letter's scan Project's page
logo

Office of the VEB-leasing company

Construction works were carried out at night in the building of the functioning BC, but it hasn't affected the terms of realization.

We would like to notice professional approach of the management of the company and qualification of engineering department.

We recommend PRIDEX as competent general contractor, reliable partner and high-class professional in the field of implementation of construction projects of a full cycle.

Letter's scan Project's page
logo

Office of Eurofinance Mosnarbank

Considering tough regulations of high-rise construction, engineers of PRIDEX company paid special attention to observance of occupational safety and also provided an order on the building site. All systems have been put into operation of the building without any remarks.

As the result of the project we can recommend PRIDEX as responsible and loyal professional construction company.
Letter's scan Project's page
logo

Office of Shiseido company

The main reason for the choice of general contractor was the fact that PRIDEX company was ready to fulfill the obligations for construction of office in compressed and accurately established period of implementation of the project. The fact that design engineering and design of engineering systems was carried out almost in parallel with construction works made things even more complicated for general contractor.

Letter's scan
logo

Office of Venture Investments & Yield Management company

The fact that PRIDEX company has own considerable financial and a manpower resources was important, because it allowed  to produce mobilization on the building site quickly and to start works the next day after signing of the contract without waiting for advance payments.

Letter's scan Project's page
logo

Office of Goltsblat BLP

During the entire period of collaboration the management of PRIDEX company has shown the ability to approach objectives responsibly, to perform works in full accordance with the contract and to resolve the arising issues quickly according to the established schedule. 
Construction works were carried out at night in the building of the functioning BC, but it hasn't affected the terms of realization.

Letter's scan Project's page
logo

Construction of World Class Four Winds fitness club

Specialists of the company have realized the project in accordance with the contract and the schedule of works. In our opinion, quite indicative is the circumstance that works were performed 24 hours a day in the functioning building in the center of Moscow.

Also we would like to mention professional approach of management of the company which has made effort for implementation of this project, especially engineering department of the company which has coped with a difficult problem of design and installation of engineering systems of fitness club.
Letter's scan Project's page
logo

Office of Transumed company

We would like to notice professional approach of specialists of the company at implementation of the project. 

All scope of works was delivered according to the German quality standards.
Letter's scan
logo

Office of OGK-4 company

We would like to notice professional approach of the management of the company and qualification of engineering department which in the shortest possible time adapted the existing engineering systems of the building according to the architectural project. During implementation of construction works the staff of PRIDEX company quickly reacted to remarks and the customer's wishes.

Letter's scan
logo

Office of Logikform Interiors company

During implementation of the project special attention was paid to control of the quality of the performed works. All the issues were resolved quickly thanks to harmonious work of the staff of the company. All wishes of the customer were taken into account, not only at the stage of producing design works, but also during implementation of the project that has allowed to achieve desirable result.

Letter's scan Project's page
logo

Office of Aerokond company

Designers of PRIDEX have offered an original concept of the office space, and specialists of the company have realized the project in accordance with the contract and the schedule of works. During period of implementation of the project representatives of PRIDEX paid special attention to control of the quality of performed construction, finishing and engineering works and also to labor protection on the building site.

Letter's scan Project's page
logo

Bon Ton office

 

Certain difficulties for the organization of construction of the project were caused by  location of the office in the functioning business center, therefor the general contractor had to carry out noisy works only at nighttime and on the weekends. Delivery of material to the object was also carried out only at night in order to avoid difficulties for the tenants of business center.

 

Letter's scan Project's page

PRIDEX 20082020